Felixstowe Dredging

Heavy duty hard-iron pumps were utilised over a 2 year period to de-sand and de-water the temporary quay works along a 720m stretch of seafront at the Port of Felixstowe. Euroflo supplied pumps, panels, pipework, and generators and service capability throughout the length of the contract.

The Pump Doctor Selecting the right pump Drainage Sludge Slurry Heavy Slurry & Dredging