Felixstowe Dredging
Heavy duty hard-iron pumps were utilised over a 2 year period to de-sand and de-water the temporary quay works along a 720m stretch of seafront at the Port of Felixstowe. Euroflo supplied pumps, panels, pipework, and generators and service capability throughout the length of the contract.






